Pipe Laying (Use of Plant)
Non-returnable
Tags:
The Pipe Laying (Use of Plant) Safe Work Method Statement (SWMS) outlines the main hazards and risks associated with the use of plant (such as excavators, cranes, etc.) to lay pipes in trenches and excavations, including risks of falls, falling objects, collapse or cave-in of excavations, and use of plant and vehicles in the vicinity of the trench or excavation. The SWMS provides details of the qualifications and competencies required where plant is used to excavate trenches and excavations and the safety precautions (including personal protective equipment requirements) to be observed when working in or near trenches and excavations where pipe laying is being carried out.
- Quantity